AAC concrete block material ratio for 1 cubic meter block

Author : RuiGuang    Time : 2013-12-17    Click :
  Customer from Libya asked on 17 December:if we take 100 kilogram from the following materials :- sand , cement , lime, gypsum & aluminum powder , and mixing these materials how much cubic meter can we have after mixing these materials altogether?
  Our answer is as below:
  As to make 1 m3 AAC block we need materials as below:
Sand :                  440kg
Lime:                   130kg
cement:                 30kg
Gypsum:                10kg   
Aluminum powder: 0.4kg    
 
So,to get 3.024m3 volume(the mould volume) after the expansion,please multiply every item by 3.024
 
Contact us directly for more details about AAC block making and AAC block plant construction.